Day 1 – Removal of the old shower and other preparations
Our bathroom fitters arrived at the job site here in Devon at the agreed time to remove the existing shower, enclosure and tiling. They then had to amend the pipe work as there was an electric shower in there previously. They amended the pipe work by running a new hot feed from the tank and then our electrician came to the job to isolate the electric from the previous shower.
Our fitters then levelled the shower tray on floorboards with the riser kit – this was a slightly tricky job as the floor boards were quite loose and there was a lot of movement in them.
At the end of the first day all or the removal and other preparation work had been completed, ready for day 2 – and fitting the new shower.
Day 2 – Fitting the new shower
Our bathroom fitters arrived the following day and confirmed all the measurements for the shower wall panelling which needed to be cut to the correct size. Having drawn up the plan the panels were cut (outside the house to ensure it was kept tidy) and then taken up to the bathroom where any amendments we made using a multi-tool. Our fitters then cut two small holes to allow the pipework for the shower to go through and then sealed back the panelling using waterproof adhesive.
After the support bars were fitted the engineers then fitted the shower screen and secured it in place, and using silicone on the shower enclosure and the panelling for the finishing touches also to make sure it was 100% waterproof.
See more of our projects by Simon Turner
Tips for deep cleaning your bathroom
It’s a chore that few of us enjoy but deep cleaning your bathroom can prevent illnesses and infections as well as making it a more pleasant place to be generally!
Are you considering a wood burning stove? – we answer your questions!
Wood burning stoves are a great choice for your home, both aesthetically and practically. As well as adding character and warmth, stoves are energy efficient and can help you save money on your energy bills.
Installation of the Durlston Balanced flue gas fire
A lovely installation of the Durlston Balanced flue gas fire with the brass and black trim and fret.
The installation of the Capital Fireplaces Woodrow 5kw Stove
The installation of the Capital Fireplaces Woodrow 5kw stove surrounded by the rainbow brick chambers in the aperture creates a beauty of a focal point.
New Bathroom fitting completed to the highest standard
Beautiful, elegant, and completed to the highest standard… There is no question why our customer has been left with nothing but complimentary comments about our company, the workmanship, and their new and improved bathroom.
Cast Tec Horizon 5 multifuel stove installation
The installation of the Cast Tec Horizon 5 multifuel stove completed by our HETAS engineer looks fantastic in the recess with the Capital rustic brick chambers.
Capital Fireplaces Woodrow Burner
The Capital Fireplaces Woodrow burner looks perfectly suited to the space and design of the chimney breast.
New and improved bathroom designed & fitted
There is no question why our customer has been left with nothing but complimentary comments about our company, the workmanship, and their new and improved bathroom.
Installation of the Elgin and Hall Huxton
A lovely installation of the Elgin and Hall Huxton electric suite.